Friday, April 27, 2018

WEEK 13 (FYP 1)

Activity: Presentation Day of The Proposed Project

This week is a presentation week for FYP1. The FYP1 took place in the Dewan Gemilang, Unikl British Malaysian Institute (BMI) on 25th April 2017. The presentation started at 2.30 pm but all student should be there as early as 1.30 for register with FYP committee. I was assigned to two assessors from the FYP committee whom are lecturers from the Electronics Section. The assessors are Sir Tarmizi and Madam Zaridah





My first assessor is Sir Tarmizi. He does not suggested anything which in my  opinion, he implied my presentation went with full satisfaction.

The second presentation is Madam Zaridah. She listened through the presentation until the question and answer (Q&A) session which she asked a few questions. Toward to the end of presentation, she suggested that that I should clearly stated the database for the IoT and should be more focus for the expected result. 

Wednesday, April 18, 2018

WEEK 12 (FYP 1)

Activity: Final Checking for Presentation

This week, i had to met my supervisor for check my presentation slide for presentation day next week. This is the list that should have in the slide:
  1. Introduction
  2. Problem statement
  3. Objectives
  4. Scopes and Limitation 
  5. Literature review 
  6. Methodology
  7. Block Diagram
  8. Flow Chart
  9. Gantt Chart FYP 1 and 2
  10. Estimated Cost
  11. Preliminary Results
  12. Expected Result
  13. Conclusion
  14. References
Figure 1:The slide for the presentation 

Friday, April 13, 2018

WEEK 11 (FYP 1)

Activity: Final Briefing and Gantt Chart


Final Briefing:
This week basically is about the final briefing of the FYP 1. The briefing was conducted in TTL 1 and the attendance of all the student that are taking the FYP 1 was compulsory.
The briefing was conducted by Madam Marwangi.

  • Date      : 11th April 2018 (Wednesday)
  • Time      : 3.00pm – 5.00pm
  • Venue    : TTL 1

The briefing in this week is highlight about:
  1. The guidelines to write a proper report with the proper format before the submission.
  2. Assessment schemes for proposal, progress report and also the presentation.
  3. Presentation checklist and preparation for the presentation.
  4. Submission date of the report and the logbook.

In this briefing, we also been brief about the FYP 1 Presentation Day next 2 weeks. The info about the presentation day as below: 
  • Date : Wednesday
  • Time : 1.30pm - 4.30pm
  • Place : Dewan Gemilang, UniKL BMI
We have to be assessed by two assessor which had been listed by Madam Marwangi. We need to be there as early as 1.30pm to be prepare for the presentation. 

Gantt Chart:
Gantt chart is a chart that plan and estimate the time that we take to complete the final year project. This is the Gantt Chart for FYP 1 and FYP 2;

Gantt Chart for FYP 1


Gantt Chart for FYP 2